Site selection
BREEAM·clause LUE 01·p.358
The requirement
BREEAM International New Construction Technical Manual clause LUE 01 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Evidence required
- Design drawings (including existing and proposed site plans), site photographs or report that confirm the previous land use and clearly identify the percentage area of the site previously developed. Acopy of the contaminated-land professional's report which confirms the degree and type of contamination present and remediation strategy, with evidence to show the investigation followed ISO 18400 or equivalent.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Disclose — information the applicant must provide
- Standing
- Required — must be met for the credential
- Impact area
- Ecosystem Health — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause LUE 01 · page 358 · build 2026-10-05-0439 · https://klarcite.com/r/297544a1e789ea31
Record details
Page 358, BREEAM NEW CONSTRUCTION LAND USE AND ECOLOGY. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 297544a1e789ea31 · document e3e19e8b697bf44b · fidelity verbatim · published 2024