Water Leak Detection and Prevention
BREEAM·clause WAT 03·p.281
The requirement
BREEAM International New Construction Technical Manual clause WAT 03 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Evidence required
- Assessor's site inspection report and photographic evidence. Final construction drawings or equivalent.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Ecosystem Health — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause WAT 03 · page 281 · build 2026-10-05-0439 · https://klarcite.com/r/2716bcebec2fd28f
Record details
Page 281, WAT 03 WATER LEAK DETECTION AND PREVENTION BREEAM NEW CONSTRUCTION. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 2716bcebec2fd28f · document e3e19e8b697bf44b · fidelity close quote · published 2024