Planning the EPD process certification

International EPD System·clause 8.5.1.5·pp.50-51

The requirement

The publisher’s words are shown on request, below the limits.

The publisher’s words

The publisher lets each reader see 19 of this document’s clauses a day when signed in, or 5 without signing in.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

How it is proven

Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Have in place — a plan, procedure or system the applicant must operate
Standing
Required — must be met for the credential

Cite this clause

International EPD System · General Programme Instructions · version v5.0.1 · clause 8.5.1.5 · page 50-51 · build 2026-10-05-0439 · https://klarcite.com/r/23186d60620574c4

Source document

Record details

Page 50-51, 8.5.1 THE EPD PROCESS 8.5.1.5 Planning the EPD process. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 23186d60620574c4 · document bb5a17f2dcfd96ba · fidelity verbatim · published 2025-02-27

Other clauses in this standard