Packaging durability

GECA·clause EV-6.3·p.36

The requirement

The publisher’s words are shown on request, below the limits.

The publisher’s words

The publisher lets each reader see 4 of this document’s clauses a day.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

How it is proven

Evidence required
Details of customer complaints about products damaged during transport or failure of products to re-loft.
Who checks it
Applicant declares — a signed statement from the applicant

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Have in place — a plan, procedure or system the applicant must operate
Standing
Required — must be met for the credential
Impact area
Circular Economy — the CMF area the clause addresses

Cite this clause

GECA · Building Insulation Materials · version BIM Gen 3.0 · clause EV-6.3 · page 36 · build 2026-10-05-0439 · https://klarcite.com/r/2296a37d2b4ee534

Source document

Record details

Page 36, EV-6.3 PACKAGING DURABILITY. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 2296a37d2b4ee534 · document 6a818ca4f3f10cf8 · fidelity verbatim · published 2026-06

Other clauses in this standard