Concept Design stage material efficiency strategies

BREEAM·clause 1b·p.320

The requirement

BREEAM International New Construction Technical Manual clause 1b — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

What the product must meet

Applies to
(all buildings)

How it is proven

Evidence required
Minutes of the workshops held. Documentation demonstrating how the feedback from the workshop has been incorporated in the concept design of the project, for example: outline specification for materials selection, report on approximate predicted reductions in material quantities.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Disclose — information the applicant must provide
Standing
Required — must be met for the credential
Impact area
Circular Economy — the CMF area the clause addresses

Cite this clause

BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause 1b · page 320 · build 2026-10-05-0439 · https://klarcite.com/r/20d423240fefdca8

Source document

Record details

Page 320, Methodology. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 20d423240fefdca8 · document e3e19e8b697bf44b · fidelity verbatim · published 2024