Transport of substructure and hard landscaping materials
BREEAM·clause One credit - Monitoring transport of construction materials and waste 17b.iv·p.57
The requirement
BREEAM International New Construction Technical Manual clause One credit - Monitoring transport of construction materials and waste 17b.iv — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Climate Health — the CMF area the clause addresses
- Refers to
- Table 79 — places elsewhere in the document
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause One credit - Monitoring transport of construction materials and waste 17b.iv · page 57 · build 2026-10-05-0439 · https://klarcite.com/r/1eb19c32b7b00527
Record details
Page 57, BREEAM NEW CONSTRUCTION MAN 03 RESPONSIBLE CONSTRUCTION. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 1eb19c32b7b00527 · document e3e19e8b697bf44b · fidelity verbatim · published 2024