Plan for demolition waste diversion and salvage
GECA·clause EV-6.1·p.33
The requirement
The publisher’s words are shown on request, below the limits.
What the product must meet
Limits held for this clause
| Parameter / context | Operator | Limit | Unit |
|---|---|---|---|
| for reuse or recycling and more than 90% of C&D waste to be diverted from dispos | ≥ | 90 | % |
The clause carries more than one limit; only the first is held as a number.
Compare this limit across schemes
The limit was read from the clause wording.
The publisher’s words
The publisher lets each reader see 3 of this document’s clauses a day.
This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.
How it is proven
- Evidence required
- DoC EV-6.1.1: a copy of the WMP, that states the required target of diversion from disposal of demolition waste. DoC EV-6.1.2: a copy of the documented procedure that prioritise the relocation of demolition waste. DoC EV-6.1.3: evidence of systems in place to protect the quality of demolition waste materials. DoC EV-6.1.4: evidence of the plan agreed upon with the waste recovery service provider.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
- Impact area
- Circular Economy — the CMF area the clause addresses
Cite this clause
GECA · Construction & Demolition Waste Services · version CDWS Gen 3.0 · clause EV-6.1 · page 33 · build 2026-10-05-0439 · https://klarcite.com/r/1b3334d889eee2de
Record details
Page 33, EV-6.1 PLANNING. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 1b3334d889eee2de · document 64328b61121907c8 · fidelity verbatim · published 2026-06