Passive design measures for two credits

BREEAM·clause Ene 04 Passive design (up to 2 credits) - Two credits·p.178

The requirement

BREEAM International New Construction Technical Manual clause Ene 04 Passive design (up to 2 credits) - Two credits — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

What the product must meet

Limits held for this clause

Parameter / contextOperatorLimitUnit
share≥10%

Compare this limit across schemes

The limit was read from the clause wording.

Applies to
(all buildings)

How it is proven

Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Meet — a limit, condition or outcome the product must satisfy
Standing
Required — must be met for the credential
Impact area
Climate Health — the CMF area the clause addresses

Cite this clause

BREEAM · BREEAM International New Construction Technical Manual · version v6.0 · clause Ene 04 Passive design (up to 2 credits) - Two credits · page 178 · build 2026-10-05-0439 · https://klarcite.com/r/145ac1b8684f7528

Source document

Record details

Page 178, Ene 04 Low carbon design. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 145ac1b8684f7528 · document c79f01533227ee10 · fidelity verbatim · published 2016