Measures to increase resilience and resistance

BREEAM·clause Prerequisite 4·p.410

The requirement

BREEAM International New Construction Technical Manual clause Prerequisite 4 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and located; only its shape defeated the harvest.

Read it at the source

How it is proven

Evidence required
Confirmation of the design flood level and design drawings to show ground level of all habitable parts of the building and access to the site and buildings to be at least 600 mm above this.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Disclose — information the applicant must provide
Standing
Required — must be met for the credential
Impact area
Ecosystem Health — the CMF area the clause addresses

Cite this clause

BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause Prerequisite 4 · page 410 · build 2026-10-05-0439 · https://klarcite.com/r/13b16ffe521b89c6

Source document

Record details

Page 410, POL 03 FLOOD AND SURFACE WATER MANAGEMENT. Read in build 2026-10-05-0439, harvested 2026-10-05.