Different functional areas
BREEAM·clause M3.2·p.191
The requirement
BREEAM International New Construction Technical Manual clause M3.2 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
What the product must meet
Limits held for this clause
| Parameter / context | Operator | Limit | Unit |
|---|---|---|---|
| parameter not recorded | > | 100 | unit not recorded |
Compare this limit across schemes
The limit was read from the clause wording.
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
- Impact area
- Climate Health — the CMF area the clause addresses
- Refers to
- Table 32 — places elsewhere in the document
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause M3.2 · page 191 · build 2026-10-05-0439 · https://klarcite.com/r/120f4d28dd72842c
Record details
Page 191, BREEAM NEW CONSTRUCTION ENE 03 ENERGY MONITORING. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 120f4d28dd72842c · document e3e19e8b697bf44b · fidelity verbatim · published 2024