Non-hazardous waste management plan
BREEAM·clause 4a·p.325
The requirement
BREEAM International New Construction Technical Manual clause 4a — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
What the product must meet
- Applies to
- (all buildings)
How it is proven
- Evidence required
- Compliant RMP defining target benchmark for resource efficiency, procedures to minimise hazardous and non-hazardous site waste, monthly reporting of all construction waste data throughout the project checked against what would be expected based on the stage of the project.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
- Impact area
- Circular Economy — the CMF area the clause addresses
Cite this clause
BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause 4a · page 325 · build 2026-10-05-0439 · https://klarcite.com/r/0fd059a3f60f0a45
Record details
Page 325, Assessment criteria. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 0fd059a3f60f0a45 · document e3e19e8b697bf44b · fidelity close quote · published 2024