Non-hazardous waste management plan

BREEAM·clause 4a·p.325

The requirement

BREEAM International New Construction Technical Manual clause 4a — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

What the product must meet

Applies to
(all buildings)

How it is proven

Evidence required
Compliant RMP defining target benchmark for resource efficiency, procedures to minimise hazardous and non-hazardous site waste, monthly reporting of all construction waste data throughout the project checked against what would be expected based on the stage of the project.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Have in place — a plan, procedure or system the applicant must operate
Standing
Required — must be met for the credential
Impact area
Circular Economy — the CMF area the clause addresses

Cite this clause

BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause 4a · page 325 · build 2026-10-05-0439 · https://klarcite.com/r/0fd059a3f60f0a45

Source document

Record details

Page 325, Assessment criteria. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 0fd059a3f60f0a45 · document e3e19e8b697bf44b · fidelity close quote · published 2024