Appointment of an appropriate consultant

BREEAM·clause Prerequisite 1·p.410

The requirement

BREEAM International New Construction Technical Manual clause Prerequisite 1 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

How it is proven

Evidence required
Copy of a compliant flood risk assessment (FRA). Evidence to confirm that the site is not a functional flood plain, where applicable.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Have in place — a plan, procedure or system the applicant must operate
Standing
Required — must be met for the credential

Cite this clause

BREEAM · BREEAM International New Construction Technical Manual · version v7.1 · clause Prerequisite 1 · page 410 · build 2026-10-05-0439 · https://klarcite.com/r/0148a5bf79c88b7b

Source document

Record details

Page 410, POL 03 FLOOD AND SURFACE WATER MANAGEMENT. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 0148a5bf79c88b7b · document e3e19e8b697bf44b · fidelity verbatim · published 2024