Scope Schedule
GECA·clause GN-1.1·p.17
The requirement
The publisher’s words are shown on request, below the limits.
The publisher’s words
The publisher lets each reader see 5 of this document’s clauses a day.
This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.
How it is proven
- Evidence required
- DoC GN-1.1.1: Detailed description of the product(s) or product range; and DoC GN-1.1.2: Explanation of applicability of the product(s) to the scope of this standard.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Disclose — information the applicant must provide
- Standing
- Required — must be met for the credential
Cite this clause
GECA · Steel & Steel Products · version SSP Gen 3.0 · clause GN-1.1 · page 17 · build 2026-10-05-0439 · https://klarcite.com/r/ff8b998a5c80005c
Record details
Page 17, GN-1.1 SCOPE SCHEDULE. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid ff8b998a5c80005c · document 6ed3ce3ae051ee8d · fidelity close quote · published 2026-06