Waste handling plan

Nordic Swan·clause O39·p.42

The requirement

The publisher’s words are shown on request, below the limits.

The publisher’s words

The publisher lets each reader see 7 of this document’s clauses a day when signed in, or 5 without signing in.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

How it is proven

Evidence required
Waste handling plan featuring waste fractions, initiatives taken and how the waste fraction is dealt with. Alternatively, an ISO 14001 certificate for the manufacturing plant and an Eco-Management and Audit Scheme (EMAS) certificate for the company can be sent to show compliance with this requirement.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Have in place — a plan, procedure or system the applicant must operate
Standing
Required — must be met for the credential
Impact area
Circular Economy — the CMF area the clause addresses

Cite this clause

Nordic Swan · Floor Coverings (029) · version Group 029 v7.3 · clause O39 · page 42 · build 2026-10-05-0439 · https://klarcite.com/r/fb1551339f6c1eb7

Source document

Record details

Page 42, Waste Handling. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid fb1551339f6c1eb7 · document 80398fbdf4e8f5cb · fidelity verbatim · publication date not recorded

Other clauses in this standard