Protection or Interpretation of L1 and other Priority Natural Lands
Living Building Challenge·clause PL-001·p.64
The requirement
Living Building Challenge Program Manual clause PL-001 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Evidence required
- Project teams must provide evidence of the organization’s primary purpose of protection, restoration, and/or interpretation of the sensitive ecology. In floodplains, project teams must also document how the project is appropriately designed to be resilient during and after a 100-year flood.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
- Impact area
- Ecosystem Health — the CMF area the clause addresses
Cite this clause
Living Building Challenge · Living Building Challenge Program Manual · version 4.1 · clause PL-001 · page 64 · build 2026-10-05-0439 · https://klarcite.com/r/f89f8a30f9890e7d
Record details
Page 64. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid f89f8a30f9890e7d · document 117acb9730a17078 · fidelity verbatim · published 2026-01