Green electricity requirement

Blue Angel·clause 3.8·p.10

The requirement

The publisher’s words are shown on request, below the limits.

What the product must meet

Limits held for this clause

Parameter / contextOperatorLimitUnit
share≥50%

The clause carries more than one limit; only the first is held as a number.

Compare this limit across schemes

The limit was read from the clause wording.

The publisher’s words

The publisher lets each reader see 3 of this document’s clauses a day.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

How it is proven

Evidence required
The applicant shall declare compliance with the requirement for the use of green electricity [Annex 1] and submit the electricity labelling data (according to the German Energy Act) as verification. In the case of manufacturers outside of the EU, a certificate in accordance with the international REC standard (I-REC) will be accepted as proof of origin.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Meet — a limit, condition or outcome the product must satisfy
Standing
Required — must be met for the credential
Impact area
Climate Health — the CMF area the clause addresses

Cite this clause

Blue Angel · DE-UZ 233 Building Waterproofing Liquid Plastics · version DE-UZ 233 · clause 3.8 · page 10 · build 2026-10-05-0439 · https://klarcite.com/r/f3dd6e3a12090d87

Source document

Record details

Page 10, 3.8 Green electricity. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid f3dd6e3a12090d87 · document 749e957e1c469f67 · fidelity close quote · published 2023

Other clauses in this standard