Air contaminant source control
LEED·clause Strategy 10. Additional Source Control and Monitoring·p.119
Klar Cite’s name for this clause. The publisher’s own heading may not be shown.
The requirement
LEED v4.1 Building Design and Construction Rating System clause Strategy 10. Additional Source Control and Monitoring — words not shown. Read it at the source. The held copy is a single-user licence and does not extend to republishing its clauses.
The clause is held and verified. Only its words are withheld.
Klar Cite classification — not the standard’s words
Addresses: air contaminant sources and monitoring
written by a model, checked against the clause
What the product must meet
- Applies to
- New Construction, Core & Shell, Schools, Retail, Data Centers, Warehouses & Distribution Centers, Hospitality, Healthcar
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Human Health — the CMF area the clause addresses
Cite this clause
LEED · LEED v4.1 Building Design and Construction Rating System · version v4.1 · clause Strategy 10. Additional Source Control and Monitoring · page 119 · build 2026-10-05-0439 · https://klarcite.com/r/ebd7730481615e34
Record details
Page 119. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid ebd7730481615e34 · document 735b8f7d282ce93c · fidelity verbatim · published 2025-02-01