The requirement

Green Star Interiors Submission Guidelines clause 25B — words not shown. Read it at the source. The held copy is a single-user licence and does not extend to republishing its clauses.

The clause is held and verified. Only its words are withheld.

Klar Cite classification — not the standard’s words

Addresses: legionella risk in water-based heat rejection systems

written by a model, checked against the clause

Read it at the source

What the product must meet

Exemptions
Where a water based heat rejection system is installed as part of the base building works, and the fitout works have no control over the base building systems (eg the tenant does not own the building) the credit is ‘Not Applicable’ and excluded from the overall score.

How it is proven

Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Meet — a limit, condition or outcome the product must satisfy
Standing
Required — must be met for the credential
Impact area
Human Health — the CMF area the clause addresses
Pathway
Option B — the document offers alternatives, and this is one

Cite this clause

Green Star · Green Star Interiors Submission Guidelines · version v1.3 · clause 25B · page 266 · build 2026-10-05-0439 · https://klarcite.com/r/e7d3cb64ee4ddda9

Source document

Record details

Page 266. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid e7d3cb64ee4ddda9 · document 9c93c11754d19283 · fidelity verbatim · published 2019-10