Legionella risk mitigation in water systems
Green Star·clause 25B·p.266
Klar Cite’s name for this clause. The publisher’s own heading may not be shown.
The requirement
Green Star Interiors Submission Guidelines clause 25B — words not shown. Read it at the source. The held copy is a single-user licence and does not extend to republishing its clauses.
The clause is held and verified. Only its words are withheld.
Klar Cite classification — not the standard’s words
Addresses: legionella risk in water-based heat rejection systems
written by a model, checked against the clause
What the product must meet
- Exemptions
- Where a water based heat rejection system is installed as part of the base building works, and the fitout works have no control over the base building systems (eg the tenant does not own the building) the credit is ‘Not Applicable’ and excluded from the overall score.
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Human Health — the CMF area the clause addresses
- Pathway
- Option B — the document offers alternatives, and this is one
Cite this clause
Green Star · Green Star Interiors Submission Guidelines · version v1.3 · clause 25B · page 266 · build 2026-10-05-0439 · https://klarcite.com/r/e7d3cb64ee4ddda9
Record details
Page 266. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid e7d3cb64ee4ddda9 · document 9c93c11754d19283 · fidelity verbatim · published 2019-10