The document this clause was read from is superseded. It is kept so older citations resolve.
Handle Force Majeure Situations with Internal Overdraw
Aluminium Stewardship Initiative·clause 8.10·p.16
The requirement
The publisher’s words are shown on request, below the limits.
What the product must meet
Limits held for this clause
| Parameter / context | Operator | Limit | Unit |
|---|---|---|---|
| share | ≤ | 20 | % |
Compare this limit across schemes
The limit was read from the clause wording.
The publisher’s words
The publisher lets each reader see 6 of this document’s clauses a day when signed in, or 5 without signing in.
This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
Cite this clause
Aluminium Stewardship Initiative · ASI Chain of Custody Standard · version V1 · clause 8.10 · page 16 · build 2026-10-05-0439 · https://klarcite.com/r/e6500b05605ee435
Record details
Page 16, 8. Mass Balance System: CoC Material and ASI Aluminium. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid e6500b05605ee435 · document 03afabbdea6dd62d · fidelity verbatim · published 2017-12