The document this clause was read from is superseded. It is kept so older citations resolve.
Inclusive design consultation
Green Star·clause Needs Analysis·p.211
Klar Cite’s name for this clause. The publisher’s own heading may not be shown.
The requirement
Green Star Buildings Submission Guidelines clause Needs Analysis — words not shown. Read it at the source. The held copy is a single-user licence and does not extend to republishing its clauses.
The clause is held and verified. Only its words are withheld.
Klar Cite classification — not the standard’s words
Addresses: needs analysis for inclusive design
written by a model, checked against the clause
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
- Impact area
- Social Health & Equity — the CMF area the clause addresses
Cite this clause
Green Star · Green Star Buildings Submission Guidelines · version v1 Rev C · clause Needs Analysis · page 211 · build 2026-10-05-0439 · https://klarcite.com/r/e593d0159e132559
Record details
Page 211. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid e593d0159e132559 · document 51b013d0b927654f · fidelity verbatim · published 2023-10