Support diversion of C&D waste from landfill

Eco Choice Aotearoa·clause 6.1(c)·p.14

The requirement

The publisher’s words are shown on request, below the limits.

What the product must meet

Limits held for this clause

Parameter / contextOperatorLimitUnit
share≥70%

Compare this limit across schemes

The limit was read from the clause wording.

The publisher’s words

The publisher lets each reader see 4 of this document’s clauses a day.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

How it is proven

Evidence required
A copy of the WMP that states the required 70% diversion rate from landfill and 50% salvage of any demolition waste.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Have in place — a plan, procedure or system the applicant must operate
Standing
Required — must be met for the credential
Impact area
Circular Economy — the CMF area the clause addresses

Cite this clause

Eco Choice Aotearoa · Construction and Demolition Waste Services · version EC-59-19 · clause 6.1(c) · page 14 · build 2026-10-05-0439 · https://klarcite.com/r/e14e40980dee0ec3

Source document

Record details

Page 14, 6.1 Planning. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid e14e40980dee0ec3 · document 9075746d41273f76 · fidelity verbatim · published 2023-06

Other clauses in this standard