Support diversion of C&D waste from landfill
Eco Choice Aotearoa·clause 6.1(c)·p.14
The requirement
The publisher’s words are shown on request, below the limits.
What the product must meet
Limits held for this clause
| Parameter / context | Operator | Limit | Unit |
|---|---|---|---|
| share | ≥ | 70 | % |
Compare this limit across schemes
The limit was read from the clause wording.
The publisher’s words
The publisher lets each reader see 4 of this document’s clauses a day.
This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.
How it is proven
- Evidence required
- A copy of the WMP that states the required 70% diversion rate from landfill and 50% salvage of any demolition waste.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
- Impact area
- Circular Economy — the CMF area the clause addresses
Cite this clause
Eco Choice Aotearoa · Construction and Demolition Waste Services · version EC-59-19 · clause 6.1(c) · page 14 · build 2026-10-05-0439 · https://klarcite.com/r/e14e40980dee0ec3
Record details
Page 14, 6.1 Planning. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid e14e40980dee0ec3 · document 9075746d41273f76 · fidelity verbatim · published 2023-06
Other clauses in this standard
| Clause | Name |
|---|---|
| 4.2 | Structure of specification |
| 5.1(a)(i) | Minimise C&D waste generation |
| 5.1(a)(ii) | Implement waste hierarchy |
| 5.1(a)(iii) | Engage with other service providers and waste generators |
| 5.1(b)(i) | Waste minimisation in the project waste plan |
| 5.1(b)(ii) | Waste hierarchy in the project waste plan |