Procurement policy for operating equipment

GECA·clause EV-3.1.5·p.36

The requirement

The publisher’s words are shown on request, below the limits.

The publisher’s words

The publisher lets each reader see 7 of this document’s clauses a day when signed in, or 5 without signing in.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

How it is proven

Evidence required
Documentation showing current maintenance schedule for all mechanical operating equipment, including relevant operating manuals and maintenance sheets; AND DoC EV-3.1.5.2: Documentation showing which licensed waste contractor is used; AND DoC EV-3.1.5.3:
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Have in place — a plan, procedure or system the applicant must operate
Standing
Required — must be met for the credential
Impact area
Climate Health — the CMF area the clause addresses

Cite this clause

GECA · Hard Surfacing · version HS Gen 3.0 · clause EV-3.1.5 · page 36 · build 2026-10-05-0439 · https://klarcite.com/r/d7ec692ff7078433

Source document

Record details

Page 36, EV-3.1 OPERATING EQUIPMENT. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid d7ec692ff7078433 · document bfb6399c60352ae9 · fidelity verbatim · published 2026-06