Protection from pollution

Concrete Sustainability Council·clause E2.03·p.27

The requirement

CSC Technical Manual (Recycled Aggregates) clause E2.03 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

How it is proven

Evidence required
1. Photographs of the storage facilities for chemicals and fuels OR The plant is ISO 14001 certified. OR The criterion is awarded by default if no chemicals and fuels are used and stored on the site.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Have in place — a plan, procedure or system the applicant must operate
Standing
Required — must be met for the credential
Impact area
Ecosystem Health — the CMF area the clause addresses

Cite this clause

Concrete Sustainability Council · CSC Technical Manual (Recycled Aggregates) · version v3.0 · clause E2.03 · page 27 · build 2026-10-05-0439 · https://klarcite.com/r/d394013a0f67c969

Source document

Record details

Page 27, E2 - Land Use. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid d394013a0f67c969 · document 0c76d0b579b9f3d6 · fidelity verbatim · published 2025-07-01

Other clauses in this standard