Transport management system

Concrete Sustainability Council·clause E8.02·p.49

The requirement

CSC Technical Manual (Precast Concrete without own fresh concrete production) clause E8.02 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

How it is proven

Evidence required
1. Extract of the transportation management system (or logistical disposition system) showing that it contains the required items.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Have in place — a plan, procedure or system the applicant must operate
Standing
Required — must be met for the credential
Impact area
Climate Health — the CMF area the clause addresses

Cite this clause

Concrete Sustainability Council · CSC Technical Manual (Precast Concrete without own fresh concrete production) · version v3.0 · clause E8.02 · page 49 · build 2026-10-05-0439 · https://klarcite.com/r/ceb37f6e7128bc2a

Source document

Record details

Page 49. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid ceb37f6e7128bc2a · document 4268d5ebebcf9b5d · fidelity verbatim · published 2025-12-01

Other clauses in this standard