Management plan for discharges to water

Eco Choice Aotearoa·clause 5.5 c·p.12

The requirement

The publisher’s words are shown on request, below the limits.

The publisher’s words

The publisher lets each reader see 3 of this document’s clauses a day.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

How it is proven

Evidence required
Conformance with these requirements in shall be demonstrated by providing a written statement on compliance, signed by the Chief Executive Officer or other authorised representative of the applicant company on application and annually. The statement shall be supported by copies of the relevant management plan and records demonstrating the management plan is being effectively implemented (including monitoring results).
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Have in place — a plan, procedure or system the applicant must operate
Standing
Required — must be met for the credential
Impact area
Ecosystem Health — the CMF area the clause addresses

Cite this clause

Eco Choice Aotearoa · Concrete · version EC-43-18 · clause 5.5 c · page 12 · build 2026-10-05-0439 · https://klarcite.com/r/cc9b187dad3997bc

Source document

Record details

Page 12, 5 ENVIRONMENTAL CRITERIA 5.5 Discharge to water from manufacturing. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid cc9b187dad3997bc · document 73ea634053d02b8c · fidelity verbatim · published 2023-06

Other clauses in this standard