Responsible land use
Concrete Sustainability Council·clause E2.02·p.35
The requirement
CSC Technical Manual (Cement Grinding and Blending) clause E2.02 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Evidence required
- 1. Concrete: Site layout showing the locations of the main plant installations including roadways, stormwater drains, retention basins, etc. AND Evidence that progressive reclamation is pursued where reasonably practical and permitted under local requirements.
- Who checks it
- Applicant declares — a signed statement from the applicant
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Disclose — information the applicant must provide
- Standing
- Required — must be met for the credential
- Impact area
- Ecosystem Health — the CMF area the clause addresses
- Level
- Bronze — the level of the credential this clause belongs to
Cite this clause
Concrete Sustainability Council · CSC Technical Manual (Cement Grinding and Blending) · version v3.0 · clause E2.02 · page 35 · build 2026-10-05-0439 · https://klarcite.com/r/c86f01301d07dc8a
Record details
Page 35. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid c86f01301d07dc8a · document 581191875b1cba6a · published 2025-12-01