Quarried Materials Management System
GECA·clause EV-3.1.2·p.32
The requirement
The publisher’s words are shown on request, below the limits.
The publisher’s words
The publisher lets each reader see 4 of this document’s clauses a day.
This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.
How it is proven
- Evidence required
- DoC EV-3.1.2.1: Information about the virgin quarried material including type of material, supplier and geographical location of mine; DoC EV-3.1.2.2: Evidence of a documented mine remediation program; DoC EV-3.1.2.3: Evidence of the relevant management plans.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Disclose — information the applicant must provide
- Standing
- Required — must be met for the credential
- Impact area
- Ecosystem Health — the CMF area the clause addresses
Cite this clause
GECA · Recycled Products · version RP Gen 3.0 · clause EV-3.1.2 · page 32 · build 2026-10-05-0439 · https://klarcite.com/r/c4f3dfffd4ad0c95
Record details
Page 32, EV-3.1.2: QUARRIED MATERIALS. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid c4f3dfffd4ad0c95 · document a229c5a1dad4cf4a · fidelity verbatim · published 2026-06
Other clauses in this standard
| Clause | Name |
|---|---|
| EV-3.1.1 | Sustainable Forest Management Certification |
| EV-4.4 | Product Stewardship Program |
| EV-5.3 | Waste Management Policies and Procedures |
| EV-6.6 | Pressurised Packaging Prohibition |
| GN-1.1 | Scope Schedule |
| GN-2.1 | Demonstrated Performance |