Traceability

Nordic Swan·clause O42·p.34

The requirement

The publisher’s words are shown on request, below the limits.

The publisher’s words

The publisher lets each reader see 6 of this document’s clauses a day when signed in, or 5 without signing in.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

How it is proven

Evidence required
Upload your company’s routine or a description of the actions to ensure traceability in your company.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Have in place — a plan, procedure or system the applicant must operate
Standing
Required — must be met for the credential

Cite this clause

Nordic Swan · Chemical Building Products (097) · version Group 097 v3.3 · clause O42 · page 34 · build 2026-10-05-0439 · https://klarcite.com/r/b9a2cfe34bc81009

Source document

Record details

Page 34. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid b9a2cfe34bc81009 · document 77b87f0460ffa376 · fidelity verbatim · publication date not recorded

Other clauses in this standard