Energy management
GECA·clause EV-5.4.2·p.44
The requirement
The publisher’s words are shown on request, below the limits.
What the product must meet
Limits held for this clause
| Parameter / context | Operator | Limit | Unit |
|---|---|---|---|
| share | ≥ | 10 | % |
Compare this limit across schemes
The limit was read from the clause wording.
The publisher’s words
The publisher lets each reader see 7 of this document’s clauses a day when signed in, or 5 without signing in.
This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.
How it is proven
- Evidence required
- Appropriate documentation (e.g., saw records) showing that product is monitored at the cut-to-size stage an exact thickness is provided; OR Description of energy recycling and/or heat recovery system supported by relevant production documentation; OR List of all energy sources used in firing; how energy is produced and/or which provider is used and calculation showing what percentage comes from renewable sources.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
- Impact area
- Climate Health — the CMF area the clause addresses
Cite this clause
GECA · Hard Surfacing · version HS Gen 3.0 · clause EV-5.4.2 · page 44 · build 2026-10-05-0439 · https://klarcite.com/r/b5ed192ed0b6eabb
Record details
Page 44, EV-5.4.2: ENERGY MANAGEMENT. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid b5ed192ed0b6eabb · document bfb6399c60352ae9 · fidelity verbatim · published 2026-06