Water system installation and upgrade
Green Star·clause 25·p.265
Klar Cite’s name for this clause. The publisher’s own heading may not be shown.
The requirement
Green Star Interiors Submission Guidelines clause 25 — words not shown. Read it at the source. The held copy is a single-user licence and does not extend to republishing its clauses.
The clause is held and verified. Only its words are withheld.
Klar Cite classification — not the standard’s words
Addresses: water systems and legionella control
written by a model, checked against the clause
What the product must meet
- Exemptions
- Where no heat rejection system(s) or water-based heat rejection system(s) are installed or no existing water-based heat rejection system(s) are upgraded as part of the fitout works this credit is ’Not Applicable’ and is excluded from the overall score.
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Human Health — the CMF area the clause addresses
Cite this clause
Green Star · Green Star Interiors Submission Guidelines · version v1.3 · clause 25 · page 265 · build 2026-10-05-0439 · https://klarcite.com/r/b5390f20fa16345e
Record details
Page 265. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid b5390f20fa16345e · document 9c93c11754d19283 · fidelity close quote · published 2019-10