The requirement

Green Star Interiors Submission Guidelines clause 25 — words not shown. Read it at the source. The held copy is a single-user licence and does not extend to republishing its clauses.

The clause is held and verified. Only its words are withheld.

Klar Cite classification — not the standard’s words

Addresses: water systems and legionella control

written by a model, checked against the clause

Read it at the source

What the product must meet

Exemptions
Where no heat rejection system(s) or water-based heat rejection system(s) are installed or no existing water-based heat rejection system(s) are upgraded as part of the fitout works this credit is ’Not Applicable’ and is excluded from the overall score.

How it is proven

Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Meet — a limit, condition or outcome the product must satisfy
Standing
Required — must be met for the credential
Impact area
Human Health — the CMF area the clause addresses

Cite this clause

Green Star · Green Star Interiors Submission Guidelines · version v1.3 · clause 25 · page 265 · build 2026-10-05-0439 · https://klarcite.com/r/b5390f20fa16345e