Rainwater retention on site

LEED·clause SS-2·p.39

Klar Cite’s name for this clause. The publisher’s own heading may not be shown.

The requirement

LEED v4.1 Building Design and Construction Rating System clause SS-2 — words not shown. Read it at the source. The held copy is a single-user licence and does not extend to republishing its clauses.

The clause is held and verified. Only its words are withheld.

Klar Cite classification — not the standard’s words

Addresses: rainwater management through LID and GI

written by a model, checked against the clause

Read it at the source

What the product must meet

The document’s own listing

All Projects Zero Lot Line Points Points Healthcare Projects 80th Percentile 70th Percentile 1 1 85th Percentile 75th Percentile 2 2 90th Percentile 80th Percentile 3 -

The document’s own compact listing of the limits, as harvested.

Applies to
New Construction, Core & Shell, Schools, Retail, Data Centers, Warehouses & Distribution Centers, Hospitality, Healthcar

How it is proven

Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Meet — a limit, condition or outcome the product must satisfy
Standing
Required — must be met for the credential
Impact area
Ecosystem Health — the CMF area the clause addresses

Cite this clause

LEED · LEED v4.1 Building Design and Construction Rating System · version v4.1 · clause SS-2 · page 39 · build 2026-10-05-0439 · https://klarcite.com/r/a7888b7f0523025c

Source document

Record details

Page 39. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid a7888b7f0523025c · document 735b8f7d282ce93c · fidelity verbatim · published 2025-02-01