Rainwater retention on site
LEED·clause SS-2·p.39
Klar Cite’s name for this clause. The publisher’s own heading may not be shown.
The requirement
LEED v4.1 Building Design and Construction Rating System clause SS-2 — words not shown. Read it at the source. The held copy is a single-user licence and does not extend to republishing its clauses.
The clause is held and verified. Only its words are withheld.
Klar Cite classification — not the standard’s words
Addresses: rainwater management through LID and GI
written by a model, checked against the clause
What the product must meet
The document’s own listing
All Projects Zero Lot Line Points Points Healthcare Projects 80th Percentile 70th Percentile 1 1 85th Percentile 75th Percentile 2 2 90th Percentile 80th Percentile 3 -
The document’s own compact listing of the limits, as harvested.
- Applies to
- New Construction, Core & Shell, Schools, Retail, Data Centers, Warehouses & Distribution Centers, Hospitality, Healthcar
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Ecosystem Health — the CMF area the clause addresses
Cite this clause
LEED · LEED v4.1 Building Design and Construction Rating System · version v4.1 · clause SS-2 · page 39 · build 2026-10-05-0439 · https://klarcite.com/r/a7888b7f0523025c
Record details
Page 39. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid a7888b7f0523025c · document 735b8f7d282ce93c · fidelity verbatim · published 2025-02-01