Risk analysis for OHS

Concrete Sustainability Council·clause S3.01·p.58

The requirement

CSC Technical Manual (Precast Concrete without own fresh concrete production) clause S3.01 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

How it is proven

Evidence required
1. Evidence of the analysis not older than two years at the moment of certification (e.g. by providing exemplary documents covering plants within the scope of certification) = 1 point. not older than one year at the moment of certification = 2 points.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Screen — a check against a list or a criterion before anything else applies
Standing
Required — must be met for the credential
Impact area
Social Health & Equity — the CMF area the clause addresses
Level
Bronze — the level of the credential this clause belongs to

Cite this clause

Concrete Sustainability Council · CSC Technical Manual (Precast Concrete without own fresh concrete production) · version v3.0 · clause S3.01 · page 58 · build 2026-10-05-0439 · https://klarcite.com/r/971935e7b14065a9

Source document

Record details

Page 58. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 971935e7b14065a9 · document 4268d5ebebcf9b5d · fidelity verbatim · published 2025-12-01

Other clauses in this standard