Waste management and material efficiency policies

GECA·clause EV-5.3·p.43

The requirement

The publisher’s words are shown on request, below the limits.

What the product must meet

Limits held for this clause

Parameter / contextOperatorLimitUnit
share≥97%

Compare this limit across schemes

The limit was read from the clause wording.

The publisher’s words

The publisher lets each reader see 6 of this document’s clauses a day when signed in, or 5 without signing in.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

How it is proven

Evidence required
DoC EV-5.3.1: Documentation of all material inputs and outputs on an annual (12-month) basis. DoC EV-5.3.2: Demonstrate progress on developing, implementing, and adhering to effective resource minimisation policies and procedures as detailed above.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Have in place — a plan, procedure or system the applicant must operate
Standing
Required — must be met for the credential
Impact area
Circular Economy — the CMF area the clause addresses

Cite this clause

GECA · Cleaning Products · version CP Gen 3.0 · clause EV-5.3 · page 43 · build 2026-10-05-0439 · https://klarcite.com/r/87289f019d0aec5a

Source document

Record details

Page 43, EV-5 ENVIRONMENTAL IMPACTS AND REDUCTION MEASUREMENTS. Read in build 2026-10-05-0439, harvested 2026-10-05.