Responsible land use

Concrete Sustainability Council·clause E2.02·p.29

The requirement

CSC Technical Manual (Precast Concrete without own fresh concrete production) clause E2.02 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

How it is proven

Evidence required
1. Concrete: Site layout showing the locations of the main plant installations including roadways, stormwater drains, retention basins, etc. The layout plan includes an explanation as to why/how the site layout enables using the land in a particularly efficient way (e.g. biodiversity, efficient traffic flow, stormwater management, efficient storage / processing of materials). Cement / Aggregates: A quarry development plan is in place which includes the extraction plan, soil management plan, and reclamation plan.
Who checks it
Applicant declares — a signed statement from the applicant

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Disclose — information the applicant must provide
Standing
Required — must be met for the credential
Impact area
Ecosystem Health — the CMF area the clause addresses
Level
Bronze — the level of the credential this clause belongs to

Cite this clause

Concrete Sustainability Council · CSC Technical Manual (Precast Concrete without own fresh concrete production) · version v3.0 · clause E2.02 · page 29 · build 2026-10-05-0439 · https://klarcite.com/r/866a88fa0b54643d

Source document

Record details

Page 29. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 866a88fa0b54643d · document 4268d5ebebcf9b5d · published 2025-12-01