Passive laundry facility requirements

Green Star·clause 15B.2.8·p.171

Klar Cite’s name for this clause. The publisher’s own heading may not be shown.

The requirement

Green Star Design & As Built Submission Guidelines (v1.3, as downloaded 2026) clause 15B.2.8 — words not shown. Read it at the source. The held copy is a single-user licence and does not extend to republishing its clauses.

The clause is held and verified. Only its words are withheld.

Klar Cite classification — not the standard’s words

Addresses: passive laundry facilities in dwellings

written by a model, checked against the clause

Read it at the source

What the product must meet

The document’s own listing

studios, 1 and 2 bedroom units: 4m total line length minimum 3 or more bedroom units: 6m total line length minimum

The document’s own compact listing of the limits, as harvested.

How it is proven

Who checks it
Applicant declares — a signed statement from the applicant

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Meet — a limit, condition or outcome the product must satisfy
Standing
Required — must be met for the credential

Cite this clause

Green Star · Green Star Design & As Built Submission Guidelines (v1.3, as downloaded 2026) · version v1.3 · clause 15B.2.8 · page 171 · build 2026-10-05-0439 · https://klarcite.com/r/8652ee2a191d0948

Source document

Record details

Page 171. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 8652ee2a191d0948 · document 7ab8c8a2e0bda472 · fidelity close quote · published 2019-09