Responsible land use
Concrete Sustainability Council·clause E2.02·p.30
The requirement
CSC Technical Manual (Marine Aggregates) clause E2.02 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
What the product must meet
- Applies to
- Aggregate
How it is proven
- Evidence required
- 1. An extraction management plan is in place for all dredging sites, which include caution for important (nature) sites and neighbouring projects.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
- Impact area
- Ecosystem Health — the CMF area the clause addresses
- Level
- Bronze — the level of the credential this clause belongs to
Cite this clause
Concrete Sustainability Council · CSC Technical Manual (Marine Aggregates) · version v3.0 · clause E2.02 · page 30 · build 2026-10-05-0439 · https://klarcite.com/r/8612ee754fb63b93
Record details
Page 30. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 8612ee754fb63b93 · document 5845577c133dc494 · published 2026-06-10
Other clauses in this standard
| Clause | Name |
|---|---|
| B1.01 | Local Economy |
| B2.01 | Ethical risk assessment |
| B2.02 | Policy or code for ethical business |
| B2.03 | Confidential investigation |
| B2.04 | Responsible political involvement |
| B2.05 | Respect for property rights |