Responsible land use

Concrete Sustainability Council·clause E2.02·p.30

The requirement

CSC Technical Manual (Marine Aggregates) clause E2.02 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

What the product must meet

Applies to
Aggregate

How it is proven

Evidence required
1. An extraction management plan is in place for all dredging sites, which include caution for important (nature) sites and neighbouring projects.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Have in place — a plan, procedure or system the applicant must operate
Standing
Required — must be met for the credential
Impact area
Ecosystem Health — the CMF area the clause addresses
Level
Bronze — the level of the credential this clause belongs to

Cite this clause

Concrete Sustainability Council · CSC Technical Manual (Marine Aggregates) · version v3.0 · clause E2.02 · page 30 · build 2026-10-05-0439 · https://klarcite.com/r/8612ee754fb63b93

Source document

Record details

Page 30. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 8612ee754fb63b93 · document 5845577c133dc494 · published 2026-06-10

Other clauses in this standard