Entryway system installation
LEED·clause Strategy 1. Entryway Systems·p.118
Klar Cite’s name for this clause. The publisher’s own heading may not be shown.
The requirement
LEED v4.1 Building Design and Construction Rating System clause Strategy 1. Entryway Systems — words not shown. Read it at the source. The held copy is a single-user licence and does not extend to republishing its clauses.
The clause is held and verified. Only its words are withheld.
Klar Cite classification — not the standard’s words
Addresses: dirt and particulate capture in buildings
written by a model, checked against the clause
What the product must meet
- Applies to
- New Construction, Core & Shell, Schools, Retail, Data Centers, Warehouses & Distribution Centers, Hospitality, Healthcar
- Exemptions
- Warehouses & Distribution Centers only: Entryway systems are not required at doors leading from the exterior to the loading dock or garage but must be installed between these spaces and adjacent office areas. Healthcare only: In addition to the entryway system, provide pressurized entryway vestibules at high-volume building entrances.
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Human Health — the CMF area the clause addresses
Cite this clause
LEED · LEED v4.1 Building Design and Construction Rating System · version v4.1 · clause Strategy 1. Entryway Systems · page 118 · build 2026-10-05-0439 · https://klarcite.com/r/8386ab50de7c166f
Record details
Page 118. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 8386ab50de7c166f · document 735b8f7d282ce93c · fidelity verbatim · published 2025-02-01