Entryway system installation

LEED·clause Strategy 1. Entryway Systems·p.118

Klar Cite’s name for this clause. The publisher’s own heading may not be shown.

The requirement

LEED v4.1 Building Design and Construction Rating System clause Strategy 1. Entryway Systems — words not shown. Read it at the source. The held copy is a single-user licence and does not extend to republishing its clauses.

The clause is held and verified. Only its words are withheld.

Klar Cite classification — not the standard’s words

Addresses: dirt and particulate capture in buildings

written by a model, checked against the clause

Read it at the source

What the product must meet

Applies to
New Construction, Core & Shell, Schools, Retail, Data Centers, Warehouses & Distribution Centers, Hospitality, Healthcar
Exemptions
Warehouses & Distribution Centers only: Entryway systems are not required at doors leading from the exterior to the loading dock or garage but must be installed between these spaces and adjacent office areas. Healthcare only: In addition to the entryway system, provide pressurized entryway vestibules at high-volume building entrances.

How it is proven

Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Meet — a limit, condition or outcome the product must satisfy
Standing
Required — must be met for the credential
Impact area
Human Health — the CMF area the clause addresses

Cite this clause

LEED · LEED v4.1 Building Design and Construction Rating System · version v4.1 · clause Strategy 1. Entryway Systems · page 118 · build 2026-10-05-0439 · https://klarcite.com/r/8386ab50de7c166f

Source document

Record details

Page 118. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 8386ab50de7c166f · document 735b8f7d282ce93c · fidelity verbatim · published 2025-02-01