Reuse of process waste from the transformation plant (optional)
EU Ecolabel·clause 2.10·p.22
The requirement
The publisher’s words are shown on request, below the limits.
What the product must meet
Limits held for this clause
| Parameter / context | Operator | Limit | Unit |
|---|---|---|---|
| share | ≥ | 80 | % |
The clause carries more than one limit; only the first is held as a number.
Compare this limit across schemes
The limit was read from the clause wording and checked by a reader.
The publisher’s words
The publisher lets each reader see 6 of this document’s clauses a day when signed in, or 5 without signing in.
This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.
How it is proven
- Evidence required
- A waste inventory for the transformation plant for a period of at least 12 months prior to the date of award of the EU Ecolabel license and shall commit to maintaining such an inventory during the validity period of the EU Ecolabel license.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Disclose — information the applicant must provide
- Standing
- Required — must be met for the credential
- Impact area
- Circular Economy — the CMF area the clause addresses
Cite this clause
EU Ecolabel · Hard covering products · version 32021D0476 · clause 2.10 · page 22 · build 2026-10-05-0439 · https://klarcite.com/r/6d5c5d425d99061a
Record details
Page 22, 2.10. Reuse of process waste from the transformation plant. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 6d5c5d425d99061a · document a64652d0f9877b8e · fidelity verbatim · published 2021-03