Responsible land use
Concrete Sustainability Council·clause E2.02·p.31
The requirement
CSC Technical Manual (Slag Grinding) clause E2.02 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
What the product must meet
- Applies to
- Cement
How it is proven
- Evidence required
- 1. Concrete: Site layout showing the locations of the main plant installations including roadways, stormwater drains, retention basins, etc. The layout plan includes an explanation as to why/how the site layout enables using the land in a particularly efficient way (e.g. biodiversity, efficient traffic flow, stormwater management, efficient storage / processing of materials). Cement / Aggregates: A quarry development plan is in place which includes the extraction plan, soil management plan, and reclamation plan. AND Evidence that progressive reclamation is pursued where reasonably practical and permitted under local requirements.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Screen — a check against a list or a criterion before anything else applies
- Standing
- Required — must be met for the credential
- Impact area
- Ecosystem Health — the CMF area the clause addresses
- Level
- Bronze — the level of the credential this clause belongs to
Cite this clause
Concrete Sustainability Council · CSC Technical Manual (Slag Grinding) · version v3.0 · clause E2.02 · page 31 · build 2026-10-05-0439 · https://klarcite.com/r/686af348dc672928
Record details
Page 31, E2 - Land Use. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 686af348dc672928 · document 137925db5c270170 · published 2025-12-01