The requirement

Living Building Challenge Program Manual clause PL-021 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and located; only its shape defeated the harvest.

Read it at the source

What the product must meet

Exemptions
Parking is existing; Disturbance of the surface is not otherwise in the project scope; The runoff from the area occupied by the solar canopies is treated.

How it is proven

Evidence required
Exception documentation will need to include drawings and calculations detailing runoff treatment.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Disclose — information the applicant must provide
Standing
Required — must be met for the credential
Impact area
Climate Health — the CMF area the clause addresses

Cite this clause

Living Building Challenge · Living Building Challenge Program Manual · version 4.1 · clause PL-021 · page 126 · build 2026-10-05-0439 · https://klarcite.com/r/68533425ac553f8c