Waste Weight Measurement
GECA·clause EV-3.6·p.29
The requirement
The publisher’s words are shown on request, below the limits.
What the product must meet
Limits held for this clause
| Parameter / context | Operator | Limit | Unit |
|---|---|---|---|
| share | ≥ | 95 | % |
Compare this limit across schemes
The limit was held in the document’s own criteria field.
The publisher’s words
The publisher lets each reader see 3 of this document’s clauses a day.
This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.
How it is proven
- Evidence required
- NMI certificate of approval; or On truck scale calibration schedule; and Recorded waste weights; and Volume-to-weight calculations.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Circular Economy — the CMF area the clause addresses
Cite this clause
GECA · Waste Collection Services · version WCS Gen 3.0 · clause EV-3.6 · page 29 · build 2026-10-05-0439 · https://klarcite.com/r/66b29a286547b5ae
Record details
Page 29. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 66b29a286547b5ae · document 18d89672a702c272 · fidelity close quote · published 2026-06