The document this clause was read from is superseded. It is kept so older citations resolve.
Process and fugitive dust reduction measures
Concrete Sustainability Council·clause E4.09·p.34
The requirement
CSC Technical Manual (Marine Aggregates) clause E4.09 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
What the product must meet
The document’s own listing
Concrete Cement Aggregates up to 4: up to 4: up to 4: 2 for one measure 2 for one measure 2 for one measure 4 as of two measures 4 as of two measures 4 as of two measures implemented implemented implemented
The document’s own compact listing of the limits, as harvested.
How it is proven
- Evidence required
- Photographic evidence of one measure taken.
- Who checks it
- Applicant declares — a signed statement from the applicant
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
- Impact area
- Ecosystem Health — the CMF area the clause addresses
- Level
- Platinum — the level of the credential this clause belongs to
Cite this clause
Concrete Sustainability Council · CSC Technical Manual (Marine Aggregates) · version v2.1 · clause E4.09 · page 34 · build 2026-10-05-0439 · https://klarcite.com/r/5c12df01311df79e
Record details
Page 34. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 5c12df01311df79e · document ad78a1b6084a2cca · fidelity verbatim · published 2022-10-21