The document this clause was read from is superseded. It is kept so older citations resolve.

Corrective actions based on incidents

Concrete Sustainability Council·clause S3.10·p.48

The requirement

CSC Technical Manual (Recycled Aggregates) clause S3.10 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

What the product must meet

Applies to
Aggregate: 2 points.

How it is proven

Evidence required
Documentation of the analysis and corrective actions, where applicable, taken after an incident.
Who checks it
Applicant declares — a signed statement from the applicant

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Have in place — a plan, procedure or system the applicant must operate
Standing
Required — must be met for the credential
Impact area
Social Health & Equity — the CMF area the clause addresses
Level
Bronze — the level of the credential this clause belongs to

Cite this clause

Concrete Sustainability Council · CSC Technical Manual (Recycled Aggregates) · version v2.1 · clause S3.10 · page 48 · build 2026-10-05-0439 · https://klarcite.com/r/566e01c59a3e05ea

Source document

Record details

Page 48, S3.10 Corrective actions based upon incidents. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 566e01c59a3e05ea · document b101af454a6b608a · fidelity verbatim · published 2022-10-21

Other clauses in this standard