Raw Material Sourcing

GECA·clause EV-3.1.1·pp.37-38

The requirement

The publisher’s words are shown on request, below the limits.

The publisher’s words

The publisher lets each reader see 3 of this document’s clauses a day.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

How it is proven

Evidence required
DoC EV-3.1.1.1: Information about the virgin material procurement program and records of the supplier, nature and geographical source of all virgin mined material inputs; and DoC EV-3.1.1.2: Certificates or other evidence of implemented EMS; documented mine rehabilitation program, and community engagement or cultural heritage plans.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Have in place — a plan, procedure or system the applicant must operate
Standing
Required — must be met for the credential
Impact area
Ecosystem Health — the CMF area the clause addresses
Also bears on
Social Health & Equity — other CMF areas the clause addresses

Cite this clause

GECA · Cement Concrete & Concrete Products · version CCCP Gen 3.0 · clause EV-3.1.1 · page 37-38 · build 2026-10-05-0439 · https://klarcite.com/r/4cb98689357e02da

Source document

Record details

Page 37-38, EV-3.1.1: RAW MATERIAL SOURCING. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 4cb98689357e02da · document ad655fc12b9bce9e · fidelity verbatim · published 2026-06

Other clauses in this standard