Ensure clear signage for construction waste bins
Eco Choice Aotearoa·clause 7.2(a)·p.16
The requirement
The publisher’s words are shown on request, below the limits.
The publisher’s words
The publisher lets each reader see 4 of this document’s clauses a day.
This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
- Impact area
- Circular Economy — the CMF area the clause addresses
Cite this clause
Eco Choice Aotearoa · Construction and Demolition Waste Services · version EC-59-19 · clause 7.2(a) · page 16 · build 2026-10-05-0439 · https://klarcite.com/r/4bdf9e2cbf6fa4d2
Record details
Page 16, 7.2 Practice. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 4bdf9e2cbf6fa4d2 · document 9075746d41273f76 · fidelity verbatim · published 2023-06
Other clauses in this standard
| Clause | Name |
|---|---|
| 4.2 | Structure of specification |
| 5.1(a)(i) | Minimise C&D waste generation |
| 5.1(a)(ii) | Implement waste hierarchy |
| 5.1(a)(iii) | Engage with other service providers and waste generators |
| 5.1(b)(i) | Waste minimisation in the project waste plan |
| 5.1(b)(ii) | Waste hierarchy in the project waste plan |