The document this clause was read from is superseded. It is kept so older citations resolve.

Verification of emission reporting

Concrete Sustainability Council·clause E4.03·p.20

The requirement

CSC Technical Manual (Annex) clause E4.03 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

How it is proven

Evidence required
Explanation: Based upon the European system of emissions monitoring, an additional verification is not required. Normally, the emissions have to be monitored by an independent third party that is accredited according to European standard EN 17025.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Meet — a limit, condition or outcome the product must satisfy
Standing
Required — must be met for the credential
Impact area
Climate Health — the CMF area the clause addresses

Cite this clause

Concrete Sustainability Council · CSC Technical Manual (Annex) · version v2.1 · clause E4.03 · page 20 · build 2026-10-05-0439 · https://klarcite.com/r/486462a14b3b712a

Source document

Record details

Page 20 of the file (printed page 19). Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 486462a14b3b712a · document acf06bfa561e1efc · published 2023-06-05

Other clauses in this standard