Recovery of process waste water sludges and sediments

Eco Choice Aotearoa·clause 5.7.1.b·p.14

The requirement

The publisher’s words are shown on request, below the limits.

The publisher’s words

The publisher lets each reader see 4 of this document’s clauses a day.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

How it is proven

Evidence required
Conformance with this requirement shall be demonstrated by providing a written statement of compliance, signed by the Chief Executive Officer or other authorised representative of the Applicant Company. This statement shall be supported by documentation that includes: A description of the methods and systems to recover process waste water sludge’s and sediments.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Have in place — a plan, procedure or system the applicant must operate
Standing
Required — must be met for the credential
Impact area
Circular Economy — the CMF area the clause addresses

Cite this clause

Eco Choice Aotearoa · Flat and Long Steel · version EC-41-25 · clause 5.7.1.b · page 14 · build 2026-10-05-0439 · https://klarcite.com/r/4596c085ff2c72fc

Source document

Record details

Page 14, 5.7 Process Emissions. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 4596c085ff2c72fc · document 82afabc3b3b8e097 · fidelity verbatim · published 2025-06

Other clauses in this standard