Free, prior and informed consent (FPIC)
Concrete Sustainability Council·clause P3.02·p.15
The requirement
CSC Technical Manual (Cement Grinding and Blending) clause P3.02 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
What the product must meet
Limits held for this clause
| Parameter / context | Operator | Limit | Unit |
|---|---|---|---|
| share | ≥ | 90 | % |
The clause carries more than one limit; only the first is held as a number.
Compare this limit across schemes
The limit was read from the clause wording.
How it is proven
- Evidence required
- Documentation of the process according FPIC or similar (see the annex) and its outcomes OR Reference to evidence for P3.01 (in case no indigenous people are potentially affected)
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
- Impact area
- Social Health & Equity — the CMF area the clause addresses
Cite this clause
Concrete Sustainability Council · CSC Technical Manual (Cement Grinding and Blending) · version v3.0 · clause P3.02 · page 15 · build 2026-10-05-0439 · https://klarcite.com/r/458e4c3d6fa642e7
Record details
Page 15. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 458e4c3d6fa642e7 · document 581191875b1cba6a · fidelity verbatim · published 2025-12-01