Spill Response Plan

Eco Choice Aotearoa·clause 5.10 b·p.14

The requirement

The publisher’s words are shown on request, below the limits.

The publisher’s words

The publisher lets each reader see 3 of this document’s clauses a day.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

How it is proven

Evidence required
Documentation describing the location and type of storage facilities on site and the materials stored in each Copy of the Spill Response Plan available for inspection if required
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Have in place — a plan, procedure or system the applicant must operate
Standing
Required — must be met for the credential
Impact area
Ecosystem Health — the CMF area the clause addresses

Cite this clause

Eco Choice Aotearoa · Portland Cement and Portland Cement Blends · version EC-42-19 · clause 5.10 b · page 14 · build 2026-10-05-0439 · https://klarcite.com/r/38e3d923f2e8d511

Source document

Record details

Page 14, 5.10 Storage of Raw Materials. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 38e3d923f2e8d511 · document 38f00cb8a69db84d · fidelity verbatim · published 2023-06

Other clauses in this standard