Transport management system
Concrete Sustainability Council·clause E8.02·p.49
The requirement
CSC Technical Manual (Cement Grinding and Blending) clause E8.02 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Evidence required
- Extract of the transportation management system (or logistical disposition system) showing that it contains the required items.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
- Impact area
- Climate Health — the CMF area the clause addresses
Cite this clause
Concrete Sustainability Council · CSC Technical Manual (Cement Grinding and Blending) · version v3.0 · clause E8.02 · page 49 · build 2026-10-05-0439 · https://klarcite.com/r/38043bb5c6d54487
Record details
Page 49. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 38043bb5c6d54487 · document 581191875b1cba6a · fidelity verbatim · published 2025-12-01